Our lighting order came from Barnitts, last week and we were so happy with the lights, however we are not having much luck with our coloured lighting cables.

we have borrowed a camera and so I can now add some photos onto the post.

There is plenty of action, Marvick are coming out tomorrrow to have a look at the windows, so watch this space, we are still waiting for the parts to come from framefast, they are then going to come and sort out the bi fold doors! Pete has finished the first fix for the electrics including the outside lights and doorbell ( we have saved the doorbell chimes from the bungalow), we have a date for the plasterers to come and and start (approx 3 weeks time) and therefore Pete and Dave have started plasterboarding some of the rooms.  Based on the number of floor tiles we had Pete has built the stud wall for the guest ensuite! and yesterday they built the wall in the main bathroom for the boys triple sink to sit on!, they also built the stud work for the shower and re built it this morning as on reflection the room could take a bigger shower. The building inspector came last week and is going to send out someone who actually can check the electrics, but he checked all the steels whilst he was here.


We need 2 computers, there is so much internet searching to do in the evenings, we are currently getting all the quotes for the 2 stoves, Pete has ordered the hot water tank and we are off to Newark to collect it next week,


sink in place in boys bathroom

 

the warmest place on site,- for repainting all the windows
wiring

guest bedroom with stud work for ensuite


 