We are still here plodding on feeling the pressure a bit now, as summer is here and we went to be in by the end of Autum, but its still lots of fun!
we are plastering downstairs, and hope to have it all plastered in about 5 weeks!
![]() |
CURVED CEILING IN PORCH PLASTER BOARDED |
![]() |
WE HAVE PUT SOME OF THE COLOURED WIRES IN THE FAMILY ROOM |
![]() |
WE HAVE LEFT THE VERANDAH FOR THE TIME BEING BUT WILL NEED TO FLATTEN OUT THE RUBBLE FOR THE SCAFFOLDING FOR THE SOLAR GUYS |
![]() |
SHOWERS GOING IN - OUR ENSUITE |
![]() |
AND EVEN SOME FURNITURE!!!! |
![]() |
SHOWER GUEST ENSUITE |
![]() |
GUEST BED FULL OF KITCHEN |
![]() |
CURVER WINDOW CILLS IN PORCH |
![]() |
PORCH PLASTERED |
![]() |
NO TOY LOUNGE PLASTERED |
![]() |
FAMILY ROOM THIS MORNING BOXING IN THE GAS PIPES |
![]() |
UTILITY PART PLASTERED |
![]() |
THE KITCHEN HAS BEEN A MASSIVE JOB TO PLASTER BOARD |
![]() |
NO TOY LOUNGE |
![]() |
THE SNUG ENTERANCE HAS BEEN LOWERED |
![]() |
AND HAS A SLOPED CEILING, THE FLOOR WILL ALSO BE RAISED |
![]() |
SOME OF THE OUTSIDE LIGHTS HAVE GONE UP- WHEN PETE HAS HAD TO DO THE WIRING BEFORE BOARDING |
![]() |
PETES GHOST!BOOOOOOOOO! |
Well done to you both. Please confirm the foot was a wind up. :-)
ReplyDeleteThis whole Blog has been an inspiration. We have two youngsters embarking on a similar project and this proves, to two old fogies(parents) that it is do-able.