Monday, 5 March 2012

COME ON KEVIN !!!!

HERE IS THE LATEST AERIAL VIEW!

TODAY THE RAIN WATER HARVESTER GOT BACK FILLED WITH GRAVEL, AND THEN THEY STARTED TO LAY BLOCKS ON THE FRONT WALL, WHICH  SHOULD GET FINISHED TOMORROW. THE NEXT JOB WILL BE LEVELLING OUT THE FLOORS IN THE ROOMS THAT NEED CONCRETING, HOPEFULLY TO HAVE CONCRETE DELIVERIES MID WEEK. 

AND OF COURSE WE ARE EAGERLY AWAITING OUR KEVIN McCLOUD MOMENT WHEN THE TIMBER FRAME DELIVEREY STARTS TOMORROW!

(why the pink?- in honour of my niece born last night!) 

Friday, 2 March 2012

JOURNEY TO THE CENTRE OF THE EARTH.......................................





















I was only out of the county for about two hours and they got up to all sorts of dangerous, edge of your seat stuff, there was still lots of action to snap when got back, and it wasn't viewing for the faint hearted!!!!! ( I'm definately going to be having lots of flashbacks and nightmares, maybe some involuntary shouting as well in the middle of the night!!) the hole for the rain water harvester was massive the photos really don't do it justice.

They managed to get to the right depth with the digger, and then made load after load of concrete to fill the dumper which  they then got right on the edge of the hole  (I'm feeling queasy writing about it!!!!) and tipped it in. Chains were concreted in and then the two parts of the tank were put together -like a huge clam, and then sealed together and lowered on to the concrete. Whilst I was out on the school run, my line prop, that they used as part of the lifting equipment (it's all very professional here!!!!!) snapped and ended in the tank so Pete had to be lowered in the tank to fetch it ( I'm feeling all funny again....!). This evening we have had to fill 1/3 with water so that it settles into the hole. Next it needs the pump putting in and pipes connected and the sides need in filling with gravel...................

ALL THIS SO WE CAN FLUSH THE BOG WITH WATER FROM THE ROOF,............................................ there must be easier ways to save the planet!




Thursday, 1 March 2012

BUILDING BRIDGES!

Another busy day on site! they had to build a bridge over the trench at the front to enable them to dig a square footing to support the stairs- and  if you think driving across the bridge in the digger looks dodgy that is nothing  compared to the massive cliff edge the digger sits on as they started to dig the hole for the rain water harvester this afternoon. ( it is being dug earlier than planned mainly because of restricted access to the back garden as the house starts to go up)





The floor looks good from tuesday and we had another load of concrete delivered this afternoon for the trench at the front of the house, there are still a couple of trenches left to dig, and then the floors in the Lounge, hall, Porch, Study, Utility and Laundry will need to be built up and laid. Pete has spoken to Harlows today and arranged deliverey for the frame etc next week, you wonder quite how much there will be as it's being delivered Tuesday, Wednesday and Thursday! 

Tomorrow they are planning to finish the hole for the rain water harvester and concrete in the chain that holds it down and stops it floating away!!!


 
SOAK AWAY FOR RAIN WATER HARVESTER AND DEATH TRAP WHEN SHUTTING CHICKENS UP AT NIGHT!


Tuesday, 28 February 2012

CHILD LABOUR!

There is only so long a 3 year old will watch from the sidelines, leave them long enough and just when they think no one is watching  they will grab a tool and get stuck in,-Don't worry Jude if it's not level we'll blame it on Grandad's Bi-focals!!!
We had one load of clay taken away this morning and then after lunch a nice young lad from Lafarge bought a load of ready mix, I  was able to help again and we got the Family Room floor done, the floor between the Family Room and Lounge and the downstairs Toilet. Later in the afternoon Pete and Dave started to dig the last internal trench.

Neil from Harlows was passing and called in this morning and they now want to deliver the sole plates and the ground floor frame all on the same load next week, Pete is still confident that they will be ready for it!!! so ready  in fact that he is taking time off site to go on an ED study day tomorrow ( there must be a new way to stick on a band aid). Tomorrow afternoon its more trench digging that means more clay--aghhhh!!! and Thursday we hope to get more concrete delivered. I am really looking forward to seeing the size of the porch, I'm  thrilled with the whole design but there are certain bits I am really keen to see and the Porch is one of them. Hopefully there will be enough pennies at the end of the whole project for a new drive - there is hardly any left!

Friday, 24 February 2012

BUILDING IN THONGS!




What a great day it was yesterday warm and sunny hopefully we can look forward to more of the same lovely for building and caravan life! , ok- not perfect for laying concrete but never mind.

 Pete and Dave worked really hard yesterday in the morning Haydn and Anna came to inspect the trenches and the prep work on the floors in the family room and the Kitchen which were all fine. Reuben Played ball and went to sleep on time! so I was able to help rake the concrete when it arrived just after lunch.

Lafarge did sent "Mr Know it all" again but he was more helpful this time and didn't once suggest that I should be inside making tea!, Pete had made a chute out of scaffolding poles etc so we could get the load further into the room, and the night before he was in the garage making tamping devises- if he carries on like this he'll have invented something to take on dragons Den before the end of the build.
Pete managed to get quite a good finish to the concrete, trowelling in the evening wearing flipflops?????, we don't need such a smooth finish at the back of the house as we are having solid wood floors, but the front of the house will need more work as we are having carpet.
After the slog of the kitchen floor they then decided to dig an internal trench (lounge and study) and hand mix the concrete to fill it so worked into the early evening.

Today Pete has dug the soak away for the rain water harvester, and started to lay the blocks in last nights trench.

The next load of concrete is due on tuesday morning- (which is no good for Reubens sleep, but it was the only slot left and Lafarge are not as bothered about working to Reubens sleeps as I am!) when we will get family room floor and another external trench filled.

Wednesday, 22 February 2012

My middle names not Kofi......................

.......but luckily Pete's is!!!  so when the neighbours over the road came to complain about the deliverey lorries driving on the grass ( that belongs to the council!)  at the front of their bungalow, he was able to softly and gently reassure them that he would do everything in his power to make sure the drivers behaved !

And talking of neighbours, in the gardens opposite there is gas contamination, which meant we had a clause in our planning to have tests on our site carried out, which would cost over £2000, helpfully the bloke who does the assessments told Pete it was cheaper to put in a thicker DPM, than to have the assessments done, but this was still twice the price of the standard DPM, so good old Dave got in touch with the contamination department and the risk is so low and we had no problems in the bungalow which had no DPM, so we have saved ourselves some money and are having the bog standard stuff,  a little bit of detective work was worth it!

The last couple of days have been spent getting the kitchen, Snug and Family Room ready for the concrete floor, the blocks in the photo are the finished floor level.
Today in the rain Pete and Dave have levelled both rooms wacker plated the crushed hardcore and covered with a  layer of sand to protect the DPM, then went down the insulation and wire mesh, the concrete is due tomorow after lunch and they are trying to decide if they  could have enough time to get concrete in the family room as well otherwise it will be tuesday.

I have been to the marina again to get more red diesel, as next week there will be lots more digger action the external trenches are not yet finished and there are more internal footings to dig.

We counted how many days until the timber frame arrives last night..... and Pete was out on site at 07.45 this morning, thats what I like to see!!!!!

Sunday, 19 February 2012

ALL HANDS ON DECK!

Things are really starting to take shape now, on Friday Pete and Dave were joined by Philip and "Long John Mark", everyone worked really hard ( making sure Mark didn't knock any wall down with the digger!!!), "philip the terminator" (AKA Norm the terminator) just spent all afternoon making load after load of concrete, the internal footings for the kitchen and family room were dug and concreted and the kitchen was levelled. It looked like they were going to run out of rubble building up the level at the back of the house (come back Farmer Jeff) but there probably will be enough with some to spare.
FROM THE SNUG LOOKING INTO THE KITCHEN,
IT STILL NEEDS A BLOCK ON TOP OF THE BLUE COURSE TO GET TO FLOOR LEVEL.
We had two ladies visit site on Friday one came to inspect the trenches (that hadn't been dug ---oooppps!) and the other to give us some hand made shepherd pies, what a great site when you open the caravan door to be greeted by your dinner all ready to pop in the oven, I won't give an oscar speech but we have been really grateful for all the help that we get that is never mentioned on this site, meals, washing, looking after of children, cakes in the playground and of course water!

Pete finally got the fork lift started, the stater motor went to visit a chap in Shardlow who had re conditioned it in the first place and with some more tinkering from Pete it fired up, there seems to be no rhymne or reason to what was wrong with it or why it decided to start -but it did and thats good enough for us.

KITCHEN
Terminator Philip is back today and they are laying the blocks in the internal footings, so we are realy begining to get an idea of the room sizes, the kitchen is great (GREAT....great...... g r e a t.....), but the family room is looking smaller than I imagined. But I know from past experiences sizes are really desceptive at this stage.

FAMILY ROOM



Tomorrow it will be more of the same, but stick with us the timber frame is not far away now and perhaps we will get some of the concrete base laid this week, Pete had a chap from Lafarge come and talk to him about some super duper self levelling concrete, but for the cost it is not worth doing it, and they are going to stick to the sawing and tamping method.

By the way, Conservatory Tom has checked in, he is alive and well and just waiting for his planning permission to come through- phew!